Post

The Midtown Greenway will be closed between 5th Ave and Bryant Ave Tuesday 10/27 to Friday 10/30 for the Pillsbury Ave S bridge reconstruction project. This is to pave the trail, slope paving, and reinstall the fence next to it. #MidtownGreenway

9 reposts26 likes