Heads up, the Midtown Greenway will be closed from Aug 3-7 for 10th Ave for bridge work and for CenterPoint Energy utility work (around 13th and 14th Aves). These were scheduled together to minimize closures. The detour is on 28th St from Park Ave S to 18th Ave S. #MidtownGreenway
5 reposts9 likes